Thursday, February 23, 2012

Thursday 23rd of February Reflection

Today in DF I had a great time and did a bit of everything. Today I firstly drilled a hole through my metal which is where the electrical wiring and the LED lighting is going to be connected. Then I went and measured and cut the amount of LED lights I would need for my lamp. Then I used this tool which I forgot the name of for smoothing the sides of the metal so it would not cut the wire when I attach it. Then I put solder on the ends of the wire and put solder on the LED lighting strip and attached them together. This is all I got completed today and had to then tape all my materials and pieces together so they would not get lost.

PROGRESSION IMAGES:



No comments:

Post a Comment